• AED to PKR – Convert UAE Dirhams to Pakistani Rupees
  • CAD to PKR – Convert Canadian Dollars to Pakistani Rupees
  • Economy.pk
  • GBP to PKR – Convert British Pounds to Pakistani Rupees
  • SAR to PKR – Convert Saudi Riyals to Pakistani Rupees
  • USD to PKR – Convert US Dollars to Pakistani Rupees
Thursday, April 16, 2026
  • Login
No Result
View All Result
Economy.pk
  • Business
  • Economy
  • Technology
  • Sports
  • Education
  • Health
  • Politics
  • World
  • Gold Rates
  • Business
  • Economy
  • Technology
  • Sports
  • Education
  • Health
  • Politics
  • World
  • Gold Rates
No Result
View All Result
Economy.pk
No Result
View All Result

Gas supply from Wali field begins

by Web Desk
June 17, 2023
in Business
0
Gas supply from Wali field begins
286
SHARES
3.9k
VIEWS
Share on FacebookX

The introduction of gas supplies into the SNGPL’s network from the OGDCL’s recently discovered gas field, Wali (Bettani), in Khyber-Pakhtunkhwa’s district Lakki Marwat, began earlier this morning (Friday).

Last year, the Oil and Gas Development Corporation (OGDCL) discovered the Wali gas field. As a result, Prime Minister Shehbaz Sharif and the Federal Ministry of Energy (Petroleum Division) instructed SNGPL to construct pipes for the injection of gas from the newly discovered gas field.

The gas flow from the Wali gas field will be treated at the OGDCL plant before being pumped into the gearbox system of Sui Northern.

The present gas supply flow rate from the gas field is 10 MMCFD, with a climb to 20 MMCFD predicted in the near future. The gas is delivered by a 50-kilometer-long high-pressure pipeline that connects OGDCL’s processing plant to the Sui Northern network in Kaka Khel, district Lakki Marwat. In addition, at the request of the OGDCL, the SNGPL built a 16-kilometer-long gathering line.

Despite security difficulties during pipeline construction, SNGPL was able to complete the 66-kilometer pipelines of 8-inch diameter from Wali Well to Kakakhel Valve Assembly in the lowest amount of time.

Both pipeline lengths, 16 kilometers from the well to the processing facility and 50 kilometers from the processing plant to the Kakakhel Valve Assembly, were successfully commissioned on June 14 and 15, respectively.

The timely completion of a pipeline construction project for gas injection, which has significant national significance due to the current energy crisis, was only made possible by the guidance of the company’s Board of Directors and current management, as well as the steadfast dedication and hard work of the SNGPL’s workforce.

Tags: GasKPKlatestWali (Bettani)
Web Desk

Web Desk

Related Posts

Saudi Arabia pledges $3bn fresh deposit, extends $5bn facility through 2028

Saudi Arabia pledges $3bn fresh deposit, extends $5bn facility through 2028

by Web Desk
April 15, 2026
0

WASHINGTON: Saudi Arabia has pledged an additional $3 billion in deposits for Pakistan and extended its existing $5 billion facility...

Aurangzeb says ‘all options on table’ to replace UAE’s $3.5bn loan, weighs strategic fuel reserve

Aurangzeb says ‘all options on table’ to replace UAE’s $3.5bn loan, weighs strategic fuel reserve

by Web Desk
April 14, 2026
0

Pakistan is exploring multiple financing options, including Eurobonds, loans from friendly countries, and commercial borrowing, to replace a $3.5 billion...

Fitch affirms Pakistan’s credit rating at ‘B-’

Fitch affirms Pakistan’s credit rating at ‘B-’

by Web Desk
April 13, 2026
0

ISLAMABAD: Fitch Ratings has affirmed Pakistan’s long-term foreign currency Issuer Default Rating (IDR) at ‘B-’ with a stable outlook, citing...

Aurangzeb arrives in Washington for IMF, World Bank spring meetings

Aurangzeb arrives in Washington for IMF, World Bank spring meetings

by Web Desk
April 13, 2026
0

Finance Minister Muhammad Aurangzeb arrived in Washington on Monday to participate in the World Bank Group and International Monetary Fund...

Pak-Turkiye relations rapidly moving towards economic partnership: PM

Pak-Turkiye relations rapidly moving towards economic partnership: PM

by Web Desk
April 7, 2026
0

Prime Minister Muhammad Shehbaz Sharif has said the centuries-old brotherly relations between Pakistan and Turkiye are rapidly moving towards a...

Pakistan to repay $4.8bn in external obligations, UAE payments part of plan: sources

Pakistan to repay $4.8bn in external obligations, UAE payments part of plan: sources

by Web Desk
April 6, 2026
0

Islamabad: Pakistan has finalized arrangements to repay $4.8 billion in external obligations by the end of June 2026, with $3.5...

Next Post
British-Pakistani diplomat awarded MBE in King's Birthday Honours list

British-Pakistani diplomat awarded MBE in King's Birthday Honours list

Ads

  • AED to PKR – Convert UAE Dirhams to Pakistani Rupees
  • CAD to PKR – Convert Canadian Dollars to Pakistani Rupees
  • Economy.pk
  • GBP to PKR – Convert British Pounds to Pakistani Rupees
  • SAR to PKR – Convert Saudi Riyals to Pakistani Rupees
  • USD to PKR – Convert US Dollars to Pakistani Rupees

© 2026 All Rights Reserved

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Business
  • Economy
  • Technology
  • Sports
  • Education
  • Health
  • Politics
  • World
  • Gold Rates

© 2026 All Rights Reserved

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.